Academy Swim Club – Banner
Green Convergence – Sun Power – Banner
Newhall Land – Banner
SCV Chinese School – Banner
Hugo Naturals – Banner
California High Speed Rail – Palmdale – Banner
San Diego Zoo – Generic – Banner
Valencia Town Center – Farmer’s Market – Banner
Union Bank – Banner
Adage IT – Banner
Facey – Banner
Simply Taylored – Banner
Beyond Harmony – Banner
Disneyland – Diamond Celebration – Banner
Newhall Land – 2015 – Banner
SCV Chinese School – Banner 2
All Americans Bail Bonds – Banner
IHOP – Banner
SCV Senior Center – Touch A Truck 2015 – Banner
Santa Clarita Autosound – Banner
Brent’s Carpet One – Banner
Action Family Counseling – Banner
Galpin Motors – Banner
College Of The Canyons – Banner
Santa Clarita Transit – Dump the Pump – Banner
AV Party Rental – Banner
Patterson’s Collision Center – Banner
Nothing Bundt Cakes – Banner
SCV Chinese School – Banner 3
Today
It is forecast to be Clear at 7:00 PM PDT on May 28, 2015
Clear
87°/58°
Home » Santa Clarita News » Caltrans Announces Closures For Vista Del Lago Project

Caltrans Announces Closures For Vista Del Lago Project

khts_caltransCaltrans plans to close multiple lanes of the Golden State Freeway (I-5) in north Los Angeles County as part of a $100.1 million pavement improvement project between Vista Del Lago Road and the Kern County line.

Motorists should expect multiple simultaneous closures in different locations within the limits listed. Closures will be signed well in advance.


Don’t miss a thing. Get breaking news alerts delivered right to your inbox


For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Lane closure information for this and other freeway projects is available on the Caltrans website: http://www.lcswebreports.dot.ca.gov/lcswebreports/

Closure Dates: Friday, May 18, to Thursday, May 24

Northbound I-5 between Vista Del Lago Rd. and Frazier Mountain Park Rd.

  • One lane: One lane may be closed at any time.
  • Up to two lanes: 7 p.m. to noon.

Southbound I-5 between Frazier Mountain Park Rd. and Vista Del Lago Rd.

  • One lane: One lane may be closed at any time.
  • Up to two lanes: 7 p.m. to noon.

About the Project

This project will replace slabs in both directions of I-5 between the Vista Del Lago Road overcrossing and the Kern County Line, a distance of 15.4 miles.

The two outside lanes and outside shoulder will be completely replaced, and damaged pavement slabs will be replaced in the inside lanes. Additionally, the project will update drainage features, upgrade the wooden guardrail posts to metal, add post mile signage, widen the inside shoulders, replace broken approach and departure slabs, and repave ramps.

This $100.1 million project, which will be completed in mid-2015, will extend the life of the pavement, reduce maintenance costs and closures, and provide a smoother ride for motorists. The contractor is Griffith/Coffman Joint Venture of Brea, Calif.

Most of the construction will be completed at night to minimize inconvenience to motorists, though there will be some work during the day.

 

Caltrans Announces Closures For Vista Del Lago Project

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

About KHTS AM 1220

Academy Swim Club – News Banner
All American Bail Bonds – News Banner
Hugo Naturals – News Banner
Beyond Harmony – News Banner
College Of The Canyons – News Banner
Action Family Counseling – News Banner
AV Party Rental – News Banner
Brent’s Carpet One – Tile
Patterson’s Collision Center – Tile
Beyond Harmony – Tile
IHOP – Tile
Union Bank – Tile
Wicall’s Carpet