Action Family Counseling – Banner
Brent’s Carpet One – Banner
Olive Terrace Bar and Grill – Banner
Hugo Naturals – Banner
Safety Town – Banner
College Of The Canyons – Banner
All Americans Bail Bonds – Banner
Newhall Land – Banner
Santa Clarita Transit – Dump the Pump – Banner
Nothing Bundt Cakes – Banner
Green Convergence – Sun Power – Banner
SCV Senior Center – Touch A Truck 2015 – Banner
Valencia Town Center – Farmer’s Market – Banner
Disneyland – Diamond Celebration – Banner
Santa Clarita Ballet – Little Mermaid – Banner
Simply Taylored – Banner
IHOP – Banner
Oakmont of Santa Clarita – Banner
Santa Clarita Autosound – Banner
Adage IT – Banner
Gerard Cosmetics – Banner
Beyond Harmony – Banner
Union Bank – Banner
Samuel Dixon – Rubber Ducky – 2015 – Banner
Newhall Land – 2015 – Banner
Academy Swim Club – Banner
Patterson’s Collision Center – Banner
Galpin Motors – Banner
Facey – Banner
AV Party Rental – Banner
Bouquet Gardens – Banner
California High Speed Rail – Palmdale – Banner
Today
It is forecast to be Clear at 7:00 PM PDT on June 01, 2015
Clear
81°/53°
Home » Santa Clarita News » Caltrans Announces Closures For Vista Del Lago Resurfacing Project

Caltrans Announces Closures For Vista Del Lago Resurfacing Project

Caltrans plans to close multiple lanes of the Golden State Freeway (I-5) in north Los Angeles County as part of a $100.1 million pavement improvement project between Vista Del Lago Road and the Kern County line.

Motorists should expect multiple simultaneous closures in different locations within the limits listed. Closures will be signed well in advance.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Lane closure information for this and other freeway projects is available on the Caltrans website: http://www.lcswebreports.dot.ca.gov/lcswebreports/

Closure Dates: Sunday, May 13, to Friday, May 18

Northbound I-5 between Vista Del Lago Road and Frazier Mountain Park
Road:

  • One lane: One lane may be closed at any time.
  • Up to two lanes: 7 p.m. to noon.

Southbound I-5 between Frazier Mountain Park Road and Vista Del Lago
Road:

  • One lane: One lane may be closed at any time.
  • Up to two lanes: 7 p.m. to noon.

About the Project

This project will replace slabs in both directions of I-5 between the Vista Del Lago Road overcrossing and the Kern County Line, a distance of 15.4 miles.

The two outside lanes and outside shoulder will be completely replaced, and damaged pavement slabs will be replaced in the inside lanes. Additionally, the project will update drainage features, upgrade the wooden guardrail posts to metal, add post mile signage, widen the inside shoulders, replace broken approach and departure slabs, and repave ramps.

This $100.1 million project, which will be completed in mid-2015, will extend the life of the pavement, reduce maintenance costs and closures, and provide a smoother ride for motorists. The contractor is Griffith/Coffman Joint Venture of Brea, Calif.

Most of the construction will be completed at night to minimize inconvenience to motorists, though there will be some work during the day.

Caltrans Announces Closures For Vista Del Lago Resurfacing Project

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

About KHTS AM 1220

College Of The Canyons – News Banner
Hugo Naturals – News Banner
Action Family Counseling – News Banner
All American Bail Bonds – News Banner
Academy Swim Club – News Banner
Beyond Harmony – News Banner
AV Party Rental – News Banner
Newhall Land – Tile
Manzanillo Restaurant – Tile
Safety Town – Tile
Santa Clarita Autosound – Tile
Brent’s Carpet One – Tile
Nothing Bundt Cakes – Tile