Today
It is forecast to be Partly Cloudy at 10:00 PM PST on December 20, 2014
Partly Cloudy
66°/46°
Home » Santa Clarita News » Caltrans Closures For I-5/SR14 Carpool Lane Project

Caltrans Closures For I-5/SR14 Carpool Lane Project

khts_caltrans4The California Department of Transportation (Caltrans) will close the following lanes, ramps, connectors and collector roads of the Antelope Valley Freeway (SR-14), the Foothill Freeway (I-210) and the Golden State Freeway (I-5) as part of a $161-million improvement project to construct High Occupancy Vehicle (HOV or carpool) lanes and a direct HOV lane connector at the I-5/SR-14 interchange.

There will be NO closures over the Thanksgiving holiday, Wednesday Nov. 25 at 5 a.m. through Sunday, Nov. 29 at 11:59 p.m. Closures are subject to change.

 

Antelope Valley Freeway (SR-14) Closures

Southbound SR-14 Collector Road to Southbound I-5 – time: 7 p.m. to 5 a.m.

Southbound SR-14 San Fernando Road Off-Ramp – time: 7 p.m. to 6 a.m.

Southbound SR-14 Connector to Southbound I-5 – time: 11 p.m. to 4 a.m.

Foothill Freeway (I-210) Closures

Westbound I-210 Collector Road to Northbound I-5 – time: 9 p.m. to 5 a.m.

Golden State Freeway (I-5) Closures

Northbound I-5 from Balboa Boulevard to SR-14 – time: 1 a.m. to 5 a.m.

Northbound Truck Route Collector Road – time: 11 p.m. to 5 a.m.

Northbound I-5 Connector to Northbound SR-14 – time: 11:59 p.m. to 5 a.m.

Southbound I-5 Balboa Boulevard Off-Ramp – time: 9 a.m. to 3 p.m. and 7 p.m. to 6 a.m.

Southbound Truck Route Collector Road – time: 11 p.m. to 4 a.m.

Southbound I-5 from SR-14 to Balboa Boulevard – time: 11:59 p.m. to 4 a.m.

Southbound I-5 Truck Route – time: 11:59 p.m. to 4 a.m.

This project involves the construction of an elevated two-lane direct HOV connector at the I-5/SR-14 interchange and construction of HOV lanes in both directions of I-5 at the interchange. A direct HOV connector will allow for freeway-to-freeway transfers without exiting the carpool lane.

The project will relieve congestion, improve traffic flow, enhance safety and improve traffic operations on both freeways at the interchange. The work is part of Caltrans’ effort to provide motorists with a seamless carpool lane network in California.

Work began in July 2008 and is on track to wrap up in the fall of 2012. Caltrans thanks the motoring public for their patience and understanding during construction.

Caltrans Closures For I-5/SR14 Carpool Lane Project

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

About hometown