Hugo Naturals – Banner
IHOP – Banner
Patterson’s Collision Center – Banner
Action Family Counseling – Banner
All Americans Bail Bonds – Banner
Adage IT – Banner
Union Bank – Banner
Valencia United Methodist Church – Luau Lunch – Banner
Newhall Land – Banner
Facey – Banner
Simply Taylored – Banner
Brent’s Carpet One – Banner
Academy Swim Club – Banner
Newhall School District – Public Hearing – Banner
Galpin Motors – Banner
Disco Fever – Banner
Nothing Bundt Cakes – Banner
Beyond Harmony – Banner
Green Convergence – Sun Power – Banner
AV Party Rental – Banner
Valencia United Methodist Church – Under God’s Sea – Banner
College Of The Canyons – Banner
Today
It is forecast to be Clear at 7:00 PM PDT on May 03, 2015
Clear
78°/50°
Home » Santa Clarita News » Freeway Closures Planned For Mulholland Bridge Construction In West LA

Freeway Closures Planned For Mulholland Bridge Construction In West LA

khts_trafficalertResidents, businesses and travelers in the vicinity of the Mulholland Bridge and the 4-05 San Diego freeway should be aware of upcoming directional closures for construction on the Mulholland Bridge that will begin Friday.

The contractor is scheduled to implement additional full directional freeway closures in order to further construct the falsework structure for the bridge. The falsework structure is designed to facilitate the reconstruction by providing temporary support to the bridge.


Don’t miss a thing. Get breaking news alerts delivered right to your inbox


 

Bridge girder plates will be temporarily placed above each bridge span and across each direction of the freeway roadway. The directional full freeway closures will be from the 101 freeway to the Getty Center Dr. ramps and are scheduled for six nights beginning Friday, March 2, weather permitting.

Each night, ramps within the freeway closure limits may begin to close as early as 7 p.m. and freeway lanes will begin to close as early as 10 p.m., leading up to the full directional freeway closure between the hours of midnight, and 5 a.m..

Details of the anticipated closure schedule:

* March 2 and 3 – Northbound I-405 freeway from Getty Center Drive to Ventura Blvd. (freeway lanes closures staring at 10 p.m.)

* March 5 and 6 – Southbound I-405 freeway from the 101 freeway to Getty Center Dr. (freeway lanes closures staring at 10 p.m.)

* March 12 and 13 – Southbound I-405 freeway from the 101 freeway to Getty Center Dr. (freeway lanes closures staring at 10 p.m.)

Sepulveda Blvd. will remain open during the nights of the full directional freeway closures and will
be used as a detour route. Detour maps are available at www.metro.net/405

Emergency access will be maintained at all times.

Freeway Closures Planned For Mulholland Bridge Construction In West LA

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

About KHTS AM 1220

AV Party Rental – News Banner
Hugo Naturals – News Banner
Beyond Harmony – News Banner
All American Bail Bonds – News Banner
Action Family Counseling – News Banner
Academy Swim Club – News Banner
College Of The Canyons – News Banner
AV Party Rental – Tile
Beyond Harmony – Tile
Union Bank – Tile
Mannered Mutt – Tile
Wicall’s Carpet
Disco Fever – Tile