Facey – Banner
Hugo Naturals – Banner
Nothing Bundt Cakes – Banner
Galpin Motors – Banner
Concerts in the Park – 2015 – Banner
Action Family Counseling – Banner
Oakmont of Santa Clarita – Banner
CLWA – Less Lawn – Banner
Gerard Cosmetics – Banner
Koalafornia – Banner
Brent’s Carpet One – Banner
Patterson’s Collision Center – Banner
Union Bank – Banner
IHOP – Banner
Olive Terrace Bar and Grill – Banner
Valencia United Methodist Church – Vacation Bible School – Banner
Safety Town – Banner
AV Party Rental – Banner
Green Convergence – Sun Power – Banner
Valencia Town Center – Farmer’s Market – Banner
College Of The Canyons – Banner
Keyboard Galleria – Banner
Adage IT – Banner
Lancaster JetHawks – Tickets – Banner
All Americans Bail Bonds – Banner
Newhall Land – Banner
Beach Bus – 2015 – Santa Clarita Transit – Banner
Santa Clarita Autosound – Banner
Samuel Dixon – Rubber Ducky – 2015 – Banner
Beyond Harmony – Banner
Academy Swim Club – Banner
Simply Taylored – Banner
Museum of the Bible – Passages – Banner
Disneyland – Diamond Celebration – Banner
Today
It is forecast to be Clear at 7:00 PM PDT on July 05, 2015
Clear
91°/60°
Home » Santa Clarita News » New Paseo Bridge Coming To Valencia

New Paseo Bridge Coming To Valencia

The City of Santa Clarita will install a new steel bridge to replace an older structure within the south Valencia paseo system at Carrizo Drive near the Valencia Valley Elementary School, starting Monday, November 5.

 

Weather permitting, the pedestrian bridge across Carrizo Drive will be closed for about 10 weeks. During the demolition of the existing bridge, Carrizo Drive east of Moreno Drive will be closed on Tuesday, November 6 between 8:30 a.m. and 5:30 p.m.

 

The installation of the new steel bridge will also require Carrizo Drive to be closed for one day. Residents should expect periodic construction noises and lane closures during construction and are advised to take alternate routes around Carrizo Drive.

 

The construction project is part of the City’s efforts to upgrade the paseo infrastructure to maintain the area’s high quality bridges and trails. Nearby residents were provided with construction notices with details of the project and contact information. Signs were also posted along the paseos and at the bridge approaches.

 

For more information about the construction of the new paseo bridge, such as dates and closures, please contact Engineering Consultant Monica Heredia at (661) 255-4332.

 

New Paseo Bridge Coming To Valencia

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

About KHTS AM 1220

Hugo Naturals – News Banner
Action Family Counseling – News Banner
AV Party Rental – News Banner
All American Bail Bonds – News Banner
Beyond Harmony – News Banner
College Of The Canyons – News Banner
Academy Swim Club – News Banner
Safety Town – Tile
Broadscast – Tile
Santa Clarita Autosound – Tile
Dermacure – Tile
Patterson’s Collision Center – Tile
Facey – Tile