SCV Chinese School – Banner 2
All Americans Bail Bonds – Banner
SCV Chinese School – Banner
Nothing Bundt Cakes – Banner
Academy Swim Club – Banner
College Of The Canyons – Banner
IHOP – Banner
Patterson’s Collision Center – Banner
PizzaRev – Banner
Beyond Harmony – Banner
Green Convergence – Sun Power – Banner
Adage IT – Banner
Newhall Land – Banner
Santa Clarita Transit – Dump the Pump – Banner
Galpin Motors – Banner
Disneyland – Diamond Celebration – Banner
Action Family Counseling – Banner
Valencia Town Center – Farmer’s Market – Banner
Newhall Land – 2015 – Banner
Simply Taylored – Banner
Facey – Banner
AV Party Rental – Banner
Union Bank – Banner
San Diego Zoo – Generic – Banner
SCV Senior Center – Touch A Truck 2015 – Banner
Santa Clarita Autosound – Banner
Hugo Naturals – Banner
Brent’s Carpet One – Banner
Today
It is forecast to be Partly Cloudy at 7:00 PM PDT on May 23, 2015
Partly Cloudy
67°/51°
Home » Santa Clarita News » New Road Closures On I-5 For Construction Of New Truck Lane
New Road Closures On I-5 For Construction Of New Truck Lane

New Road Closures On I-5 For Construction Of New Truck Lane

PRESS RELEASE | CALTRANS
Road cImagelosures on the southbound I-5 between Pico Canyon Road/Lyons Avenue and the Antelope Valley Freeway (SR-14) have been planned by the California Department of Transportation (Caltrans).  Implemented closures are due to the construction of a truck lane.


Don’t miss a thing. Get breaking Santa Clarita news alerts delivered right to your inbox.


There will be staggered ramp closures, signed detours, and no unusual levels of dust, noise or vibration.  Closures subject to change.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Closure information for this and other freeway projects is available on the Caltrans website:http://www.lcswebreports.dot.ca.gov/lcswebreports/

For real-time traffic information, visit quickmap.dot.ca.gov, go511.com, or call 5-1-1.

Closure Dates: Sunday, August 18, through Saturday, August 24, 2013

 

NORTHBOUND I-5

Lanes

  • Up to three lanes of northbound I-5 between the end of the existing truck lane and Lyons Ave. — 9 p.m. to 5 a.m.

Note: At least one lane will be open at all times. The most restrictive closures (i.e., the most lanes closed) will occur between 1 a.m. and 4 a.m.

 

SOUTHBOUND I-5

Lanes

  • Up to three lanes of southbound I-5 between Lyons Ave. and the end of the existing truck lane — 9 p.m. to 5 a.m.

Note: At least one lane will be open at all times. The most restrictive closures (i.e., the most lanes closed) will occur between 1 a.m. and 4 a.m

Connector

  • Southbound I-5 to northbound SR-14 — 9 p.m. to 6 a.m. and 9 a.m. to 3 p.m.

Off-Ramp

  • Calgrove Blvd. — 9 p.m. to 6 a.m. and 9 a.m. to 3 p.m.

About the Project 

The project is adding a truck lane to the outside of southbound I-5 by paving the median area and outside shoulder, and shifting the mixed-flow lanes inward. Median retaining walls and two short sections of outside retaining walls will be built to accommodate this widening.

The truck lane will extend from Pico Canyon Road/Lyons Avenue to SR-14, a distance of 3.7 miles.

This project will ease traffic delays, improve goods movement, absorb traffic growth due to population increase (both residential and commercial), and enhance safety by separating truck traffic from passenger vehicles.

Construction began in May 2012 and will be completed in 2014. Funds administered by Metro.

For more information, visit www.I-5info.com.


Do you have a news tip? Call us at (661) 298-1220, or drop us a line at community@hometownstation.com.




Source: Santa Clarita News


New Road Closures On I-5 For Construction Of New Truck Lane

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

About KHTS AM 1220

Action Family Counseling – News Banner
All American Bail Bonds – News Banner
AV Party Rental – News Banner
Beyond Harmony – News Banner
Academy Swim Club – News Banner
Hugo Naturals – News Banner
College Of The Canyons – News Banner
Facey – Tile
Action Family Counseling – Tile
Wicall’s Carpet
Galpin Motors – Tile
Academy Swim Club – Tile
PizzaRev – Tile