Home » Santa Clarita News » Press Releases » Closures On State Route 14 Scheduled For Golden Valley Bridge Widening Project
From Tuesday, Aug. 4 to Saturday, Aug. 22, State Route 14 and the Golden Valley Road Bridge will be subject to night closures to accommodate the Golden Valley Road Bridge widening project, city officials said Tuesday.
Photo courtesy of SCV News.

Closures On State Route 14 Scheduled For Golden Valley Bridge Widening Project

Ed. note: The following is a press release from the city of Santa Clarita.

State Route 14 will be subject to nightly closures in order to accommodate the Golden Valley Bridge widening project.


Sponsored Articles


Don’t miss a thing. Get breaking Santa Clarita news alerts delivered right to your inbox.

The nightly closures for the Golden Valley Bridge widening project will take begin Tuesday, Sept. 8, 2015 through Friday morning Sept. 11, 2015.

Additional nightly closures for the construction will resume on Tuesday, Sept. 15, 2015 through Thursday morning, Sept. 17.

During the construction, the northbound State Route 14 will be subject to closures from midnight to 6:00 a.m. and the southbound State Route 14 will be subject to closures from 11:00 p.m. to 4:00 a.m. from Sept. 8, 2015 to Sept. 11, 2015 and Sept. 15, 2015 to Sept. 17, 2015. Both directions of the State Route 14 will never be closed at the same time.

State Route 14 traffic will be detoured utilizing respective State Route 14 off-ramps and on-ramps in each direction. Motorists who travel during the early hours through this area are advised to plan on slightly heavier traffic.

Related: Golden Valley Road And 14 Fwy Closures During Bridge Widening

The Golden Valley Road Bridge widening project will add an additional two lanes of travel, one in each direction, for a total of four through lanes on the bridge, as well as a dedicated left turn lane to access the southbound State Route 14 and two left turn lanes to access the northbound State Route 14.

This project will also add a pedestrian walkway on the north side of the bridge and a bike path on the south side of the bridge.

To watch the expansion of the Golden Valley Road Bridge online, check out the live Construction Cam on the City’s website.

For additional information on the Golden Valley Road Bridge widening project, including traffic schedules and detours, please contact Project Manager Harry Corder at (661) 290-2290 or gvr@santa-clarita.com.

To receive email alerts on the Golden Valley Road Bridge widening project and other construction projects in the City, sign up at Santa-Clarita.com/eNotify.

Do you have a news tip? Call us at (661) 298-1220, or drop us a line at community@hometownstation.com.

KHTS AM 1220 - Santa Clarita Radio

Closures On State Route 14 Scheduled For Golden Valley Bridge Widening Project

One comment

  1. This improvement will not help much as to many homes are being built and that’s adding thousand of more cars to Golden Valley/Newhall Rd. Sorry, it’s too late.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.

About Enzo Marino

Enzo became a staff writer at KHTS AM-1220 in June 2015. He is working towards his Associates Degree in New Media Journalism at College of the Canyons where he is currently involved with Cougar News, the on-campus student and community news outlet. Enzo’s passion for news started when he was an intern at KNBC-4 in Burbank