Today
It is forecast to be Clear at 11:00 PM PDT on October 22, 2014
Clear
84°/57°
Home » Santa Clarita News » Temporary Road Closure Scheduled For Vasquez Canyon Road

Temporary Road Closure Scheduled For Vasquez Canyon Road

Vasquez Canyon Road is scheduled to close temporarily to erect a new
bridge.  

Vasquez Canyon
Road will be closed at Bouquet Canyon Road in spring while a permanent
bridge is constructed to replace the one lost in a recent fire.

The plans call for the closure of one lane at a time while
the permanent structure is being built.  Traffic
will be directed by temporary traffic signals.

Construction is estimated to take eight months to
complete.

The original all wooden bridge was destroyed by the Buckweed
fire in 2007, and was replaced with a 40 foot temporary bridge shortly after
the fires were extinguished. 

Temporary Road Closure Scheduled For Vasquez Canyon Road

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

About hometown