Santa Clarita Transit – Dump the Pump – Banner
Hugo Naturals – Banner
Newhall Land – 2015 – Banner
San Diego Zoo – Generic – Banner
Valencia Town Center – Farmer’s Market – Banner
Union Bank – Banner
Newhall Land – Banner
IHOP – Banner
Patterson’s Collision Center – Banner
Simply Taylored – Banner
Green Convergence – Sun Power – Banner
SCV Senior Center – Touch A Truck 2015 – Banner
Facey – Banner
Beyond Harmony – Banner
Action Family Counseling – Banner
Adage IT – Banner
Nothing Bundt Cakes – Banner
Santa Clarita Autosound – Banner
All Americans Bail Bonds – Banner
Brent’s Carpet One – Banner
Disneyland – Diamond Celebration – Banner
Academy Swim Club – Banner
College Of The Canyons – Banner
Galpin Motors – Banner
AV Party Rental – Banner
PizzaRev – Banner
Today
It is forecast to be Partly Cloudy at 7:00 PM PDT on May 26, 2015
Partly Cloudy
80°/54°
Home » Santa Clarita News » This Week’s I-5 Lane Closures In Pyramid-Gorman Area

This Week’s I-5 Lane Closures In Pyramid-Gorman Area

 The California Department of Transportation plans to close multiple lanes of the Golden State Freeway (I-5) in CalTransnorth Los Angeles County as part of a $100.1 million pavement improvement project between Vista Del Lago Road and the Kern County line.

Motorists should expect multiple simultaneous closures in different locations within the limits listed. Closures will be signed well in advance.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Closure information for this and other freeway projects is available on the Caltrans website:http://www.lcswebreports.dot.ca.gov/lcswebreports.

Monday, October 8, to Saturday, October 13

* Northbound I-5 between Vista Del Lago Rd. and the Kern County line

One lane: One lane may be closed at any time.

Up to three lanes: 7 p.m. to 11 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

* Southbound I-5 between the Kern County line and Vista Del Lago Rd.

One lane: One lane may be closed at any time.

Up to three lanes: 7 p.m. to 11 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

 

About the Project

This project will replace slabs in both directions of I-5 between the Vista Del Lago Road overcrossing and the Kern County Line, a distance of 15.4 miles.

The two outside lanes and outside shoulder will be completely replaced, and damaged pavement slabs will be replaced in the inside lanes. Additionally, the project will update drainage features, upgrade the wooden guardrail posts to metal, add post mile signage, widen the inside shoulders, replace broken approach and departure slabs, and repave ramps.

This $100.1 million project, which will be completed in mid-2015, will extend the life of the pavement, reduce maintenance costs and closures, and provide a smoother ride for motorists. The contractor is Griffith/Coffman Joint Venture of Brea, Calif.

Most of the construction will be completed at night to minimize inconvenience to motorists, though there will be some work during the day.

This Week’s I-5 Lane Closures In Pyramid-Gorman Area

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

About KHTS AM 1220

Academy Swim Club – News Banner
College Of The Canyons – News Banner
AV Party Rental – News Banner
Beyond Harmony – News Banner
Action Family Counseling – News Banner
All American Bail Bonds – News Banner
Hugo Naturals – News Banner
SCV Senior Center – Touch A Truck 2015 – Tile
Nothing Bundt Cakes – Tile
Newhall Land – Tile
San Diego Zoo – Generic – Tile
Broadscast – Tile
PizzaRev – Tile