Ed. Note: The following is a news release courtesy of the city of Santa Clarita.
Lanes will be shut down at the intersection of Bouquet Canyon Road and Seco Canyon Road while Southern California Edison workers replace a large utility pole.
Sponsored Articles
The work is scheduled to begin at 8:00 p.m. on Saturday, October 10, 2015. The work should take no longer than 22 hours and should be completed by 6:00 p.m. on Sunday, October 11.
Related: Santa Clarita Traffic Center Keeps Commuters Moving
The construction will require the closure of two eastbound traffic lanes on Bouquet Canyon Road, with one through lane and one left turn lane open during the majority of the work. Traffic will be reduced to a single lane for a short period during late night hours.
The traffic signal at the intersection of Bouquet Canyon Road and Seco Canyon Road will be set to flashing red, creating an all-way stop. Santa Clarita Sheriffs will be on site Sunday to assist with traffic control.
Regular commuters along Bouquet Canyon Road or Seco Canyon Road are encouraged to plan ahead when traveling during these times.
For more information about the lane closures on Bouquet Canyon Road, please contact Senior Traffic Engineer Gus Pivetti at (661) 286-4047.
Do you have a news tip? Call us at (661) 298-1220, or drop us a line at community@hometownstation.com.