Home » Santa Clarita News » Traffic » Caltrans Implements Closures On Interstate 5 Freeway
Santa Clarita Traffic News - Traffic Update

Caltrans Implements Closures On Interstate 5 Freeway

California Department of Transportation officials plan to implement closures during the week of Nov. 12-15, 2014 (no work Saturday and Sunday nights), as part of a pavement improvement project on the Golden State Freeway (I-5) between Vista Del Lago Road and the Kern County line.


Sponsored Articles


Don’t miss a thing. Get breaking Santa Clarita news alerts delivered right to your inbox.

In observance of Veterans Day, there will be no closures for this project on November 10 and 11, 2014.

Consecutive ramps will NOT be closed at the same time. Signs will be posted for all detours. No unusual levels of dust, noise or vibration are expected. Closures are subject to change.

TO AVOID DELAYS (especially if you will be traveling at night), check the Caltrans QuickMap before you leave to get real-time traffic information and see congestion hotspots. Take an alternate route if necessary. You can also call 5-1-1 for travel times and other helpful motorist information.

Closure information for this and other freeway projects is available on the Caltrans website.

Closures for the I-5 Pavement Improvement Project — Vista Del Lago Road to Kern County Line

Expect DELAYS on I-5 between 9 p.m. and 6 a.m. At times, only ONE LANE will be open.

NORTHBOUND I-5

Lanes

  • Up to three lanes of southbound I-5 will be closed between one mile south of Vista Del Lago Road and the Kern County line from 8 p.m. to 6 a.m.
  • Two lanes may be closed during off-peak daytime hours.
  • The most restrictive closures (i.e., the most lanes closed) will occur between midnight and 4 a.m.
  • At least one lane will be open at all times. Check the Caltrans Quickmap before you leave for traffic speeds in the area.

SOUTHBOUND I-5

Lanes

  • Up to three lanes of southbound I-5 will be closed between the Kern County line and one mile south of Vista Del Lago Road from 8 p.m. to 6 a.m.
  • Two lanes may be closed during off-peak daytime hours.
  • The most restrictive closures (i.e., the most lanes closed) will occur between midnight and 4 a.m.
  • At least one lane will be open at all times. Check the Caltrans Quickmap before you leave for traffic speeds in the area.

About the Project

This project will replace slabs in both directions of I-5 between the Vista Del Lago Road overcrossing and the Kern County Line, a distance of 15.4 miles.

The two outside lanes and outside shoulder will be completely replaced, and damaged pavement slabs will be replaced in the inside lanes. Additionally, the project will update drainage features, upgrade the wooden guardrail posts to metal, add post mile signage, widen the inside shoulders, replace broken approach and departure slabs, and repave ramps.

This $100.1 million project, which will be completed in fall 2014, will extend the life of the pavement, reduce maintenance costs and closures, and provide a smoother ride for motorists. The contractor is Griffith/Coffman Joint Venture of Brea, Calif.

Most of the construction will be completed at night to minimize inconvenience to motorists, though there will be some work during the day.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Story courtesy of SCVNews.

Do you have a news tip? Call us at (661) 298-1220, or drop us a line at community@hometownstation.com.

KHTS AM 1220 - Santa Clarita Radio

Caltrans Implements Closures On Interstate 5 Freeway

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.

About KHTS Newsroom

KHTS FM 98.1 & AM 1220 focuses on Santa Clarita news, traffic, weather, sports, and also plays music. Bringing you SCV breaking news first and keeping you up to date with Santa Clarita events.