Home » Santa Clarita News » Vasquez Canyon Road To Close Tuesday For Construction

Vasquez Canyon Road To Close Tuesday For Construction

khts_trafficalertThe County of Los Angeles Department of Public Works (Public Works) has scheduled a full closure for Vasquez Canyon Road.  The closure is necessary to secure public safety during a stage I construction procedure.  The date and time of this closure is subject to change.

The schedule is as follows:

  • Tuesday December 8, 2009, between 9 a.m. and 7 p.m., both east and westbound traffic lanes will be closed.

As part of stage I construction, the contractor will be operating oversized equipment that  will encroach onto Vasquez road and partially block through traffic.  In addition to the road closure, changeable message board signs are posted throughout the area to relay advanced warning of the pending road closure to motorists.

For more information about the road closure or the bridge replacement construction project, area residents can call the Public Works resident engineer, Ali Dana, at (626) 482-2732.

 

Vasquez Canyon Road To Close Tuesday For Construction

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.

About KHTS FM 98.1 & AM 1220

As Santa Clarita’s only local radio station, KHTS FM 98.1 & AM 1220 mixes in a combination of news, traffic, sports, along with your favorite adult contemporary hits by artists such as Rob Thomas, Taylor Swift, Katy Perry and Maroon 5. We are vibrant member of the Santa Clarita community. Our broadcast signal reaches all of the Santa Clarita Valley and parts of the high desert communities located in the Antelope Valley. We stream our talk shows over the web, reaching a potentially worldwide audience.